Avaya IP500 V2 Instruções de Operação Página 77

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 442
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 76
Installing IP500/IP500 V2 Page 77
15-601042 Issue 28g (11 October 2013)IP Office 9.0
IP500 V2 Installation: Documentation
4.3 Unpacking
Use the following procedure when unpacking any equipment supplied by
Avaya or an Avaya reseller or distributor.
Information Required
· o Equipment Checklist.
An installation checklist of the parts and equipment ordered for the
installation.
Procedure
1.o Check for Packaging Damage
Before unpacking any equipment, check for any signs of damage that may have occurred during transit. If any
damage exists bring it to the attention of the carrier.
2.o Check the Correct Parts Have Been Delivered
Check all cartons against the packing slip and ensure that you have the correct items. Report any errors or
omissions to the equipment supplier.
3.o Retain All Packaging and Documentation
While unpacking the equipment, retain all the packaging material. Fault returns are accepted only if repackaged in
the original packaging. If performing a staged installation, the original packaging will also assist when repacking
equipment to be moved to the final install site.
4.o Ensure that Anti-Static Protection Measures are Observed
Ensure that anti-static protection measures are observed at all times when handling equipment with exposed
electrical circuit boards.
5.o Check All Parts
Visually inspect each item and check that all the necessary documentation and accessory items have been
included. Report any errors or omissions to the dealer who supplied the equipment.
6.o Check All Documentation
Ensure that you read and retain any documentation included with the equipment.
Vista de página 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 441 442

Comentários a estes Manuais

Sem comentários