Avaya IP500 V2 Instruções de Operação Página 188

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 442
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 187
Installing IP500/IP500 V2 Page 188
15-601042 Issue 28g (11 October 2013)IP Office 9.0
9. IP500 Basic Installation
9.1 IP500 Tools Required
The following is a general summary of the tools required. Additional tools and equipment will be
required for wall and or rack mounting and to fashion ground cable connections suitable to local
requirements.
· Tools Required
· o 5mm Flat-blade screwdriver.
· o Crosshead screwdriver.
· o Anti-static wrist strap and ground point.
· o RJ45-RJ45 Ethernet LAN Cable.
· o M4 Cross-Head Screwdriver.
· o Tools suitable for crimping a cable spade.
· o If wall mounting, drills and tools for wall mounting fixtures.
· Additional Parts Required
In addition to orderable IP Office equipment, the following items will be required.
· o 14AWG Solid copper wire for ground connection of control units and expansion modules.
· o Cable sleeve matching local regulator requirements for ground wires. Typically green for a functional
ground and green/yellow for a protective ground.
· o If wall mounting, additional fixtures and fittings suitable for the wall type and mounting kit being used.
· o Cable ties and labels for tidying and identifying cables.
Vista de página 187
1 2 ... 183 184 185 186 187 188 189 190 191 192 193 ... 441 442

Comentários a estes Manuais

Sem comentários