14 Chapter 4 Upgrading to BCM50 2.0 and SRG50 2.0
NN40020-401
Figure 1 Element Manager
To perform the BCM50 2.0 or SRG50 2.0 upgrade
1 Complete the pre upgrade tasks (see “Pre upgrade tasks” on page 9).
2 Install the BCM50 2.0 version of Element Manager (see “Installing Element Manager for
BCM50 2.0” on page 15).
3 Verify that the time zone is set to a valid entry (see “Verifying the time zone” on page 16).
4 Perform the first stage of the upgrade (see “Performing the first stage of the upgrade” on page
16).
5 Apply the keycode for BCM50 2.0 or SRG50 2.0 (see “Applying the keycode file” on page
16).
6 Perform the second stage of the upgrade (see “Performing the second stage of the upgrade” on
page 17).
7 Optionally, perform the third stage of the upgrade (see “Performing the third stage of the
upgrade (optional)” on page 17).
Scheduling the upgrade
Using Element Manager, you can schedule the stages of the upgrade to begin at a later time
(Administration > Software Management > Software Updates > Scheduled Updates tab).