Mounting the RPI unit
When you mount the RPI unit, ensure you are following these guidelines before you start with
step 1 below:
• Leave a clearance of a minimum of 125 mm (5 in.) around the RPI to provide acceptable
ventilation and to prevent overheating.
• Leave a clearance of a minimum of 300 mm (12 in.) between two RPIs if you are installing
them above one another, to provide acceptable ventilation and to prevent overheating.
• Install RPIs a minimum of 300 mm (12 in.) from the ceiling.
1 Partially screw in two #10 50 mm (2 in.) screws using the keyholes in the back of the unit, at
the top, as a guide. Refer to the following figure.
Figure 3 RPI mounting holes
2 Open the cover with a screwdriver.
a On the latch on the right side of the unit, use the screwdriver to push in, and then down, to
release the latch.
b Remove the cover by lifting it up. Refer to the following figure.
Figure 4 Opening the RPI cover
325 mm
(13 in.)
25 mm
(1 in.)
50 mm
(2 in.)
300 mm
(12 in.)